220V Enkele Stuk Natte Doekjes Maak- en Verpakkingsmachine 2 in 1 Machine

Wipes machine
July 12, 2025
Category Connection: Nat veegt Verpakkingsmachine af
Brief: Discover the 220V Single Piece Small Make-up Removal Wet Wipe Making Packing Machine 2 in 1 Machinery, a high-efficiency solution for producing and packaging wet wipes. This machine combines making and packing into one seamless process, featuring dual cutters for high-speed production. Ideal for lens wipes, make-up removal wipes, and more, it offers customizable packaging sizes and easy operation. Perfect for businesses seeking reliable, high-quality wet wipe production.
Related Product Features:
  • Combines wet wipe making and packing into a single 2-in-1 machine for efficiency.
  • Features dual cutter design for high-speed production up to 60-80 bags per minute.
  • Customizable packaging sizes to meet diverse product requirements.
  • Operates on 220V power supply with a low power consumption of 2.2KW.
  • Compact dimensions (L3200mm × W2100mm × H1500mm) suitable for small-scale production.
  • Made from high-quality materials with CE certification for safety and reliability.
  • Easy to operate and maintain, with tutorial videos provided for guidance.
  • Supports various packing films, including aluminum-coated and paper aluminum films.
FAQ's:
  • What types of wet wipes can this machine produce?
    This machine is designed for manufacturing lens wipes, make-up removal wipes, cleaning wipes, and similar products.
  • What is the production capacity of this machine?
    The machine can produce 60-80 bags per minute, making it highly efficient for small to medium-scale production.
  • Is technical support available for this machine?
    Yes, professional technical support is provided, including assistance with installation, operation, maintenance, and repair.
  • Can the packaging size be customized?
    Yes, the packaging size can be customized to meet specific product requirements.
  • What is the delivery time for this machine?
    The delivery time is typically 30-40 working days after the order is confirmed.